Read e-book online Good Practices for Cost-Effective Mgmt of Nuclear PDF

Read Online or Download Good Practices for Cost-Effective Mgmt of Nuclear Powerplants (IAEA TECDOC-928) PDF

Similar nuclear books

Download e-book for kindle: The Atomic Bomb and the Origins of the Cold War by Prof. Campbell Craig

The authors of this booklet make the case that the atomic bomb used to be major consider growing the chilly warfare. FDR and later Truman desired to use the atomic bomb as a diplomatic lever opposed to the Soviet Union. either one of those presidents might basically percentage the key of the bomb with the Soviets in the event that they complied with the yank calls for on letting the japanese ecu nations pursue their very own future.

Download PDF by WORKSHOP ON THE INDEMNIFICATION OF NUCLE: Indemnification of Damage in the Event of a Nuclear

The second one overseas Workshop at the Indemnification of Nuclear harm was once held in Bratislava, Slovak Republic, from 18 to twenty may well 2005. The workshop was once co-organised via the OECD Nuclear strength organization and the Nuclear Regulatory Authority of the Slovak Republic. It attracted broad participation from nationwide nuclear specialists, regulators, operators of nuclear installations, nuclear insurers and foreign corporations.

J. A. Davies (auth.), E. Recknagel, J. C. Soares (eds.)'s Nuclear Physics Applications on Materials Science PDF

The decade has obvious a fast improvement and turning out to be significance within the software of nuclear physics the right way to fabric sciences. it's a basic wish to comprehend glossy fabric difficulties on a microscopic scale, which, because of their inherent microscopic nature, made nuclear recommendations hugely appropriate instruments for simple and utilized learn during this box.

Additional resources for Good Practices for Cost-Effective Mgmt of Nuclear Powerplants (IAEA TECDOC-928)

Example text

Hinge pin and disc stud wear: additional degradation can be determined from stable flow, stroke, and leak tests. Excessive wear will degrade valve performance and may lead to leakage or failure of integral valve parts. Missing or stuck disc: the above phenomena can eventually lead to a missing or stuck disc. Such a condition can allow flow in reverse of the intended direction. This can lead to over pressurization, diversion from the intended flow path, or contamination. Similar to on-line systems portable valve diagnostics systems use state-of-the-art advanced signal conditioning electronics, but implement the monitoring through an industrial grade laptop computer for data collection, and user-friendly software to collect and analyze data on key parameters associated with the operation of an MOV.

Management is responsible for providing workers with all the things they need to succeed. Planning provides the mechanism for management to carry out its responsibility. Continually performing maintenance tasks successfully (in accordance with management's expectations) is personally rewarding and satisfying. Continual success has a strong influence in maintaining positive attitudes. • Effective planning allows workers to complete work when scheduled by eliminating process induced delays, thereby not encouraging workers to short-cuts because work time has been compressed and scheduled completion time looms.

Does the activity create a significant risk to personnel safety? The number of layers in the process will depend on individual plant, company or regulatory requirements. However, too many layers will make the process difficult to understand. One example of graduated work controls follows: Minor Maintenance Reference Package Compliance Package 41 Requirements Examples Minor Maintenance • • • • Does not require a permanent plant record Does not require a written procedure or instructions Worker expected to use appropriate resources record of work maintained in electronic database as appropriate Preventive maintenance on Balance-ofPlant equipment where there is no risk of a plant trip or transient Tighten tubing fittings Valve packing adjustments Replace annunciator cards Replace pressure indicators Reference Package • • • Record will be maintained in permanent plant files Activity does not require a written procedure or instructions Worker expected to use appropriate resources Compliance Package • Record will be maintained in permanent plant files • Activity requires a written procedure or work instructions Safety MOV limit switch adjustment Replace disc on manual valve Minor PM on safety equipment EQ elastomer replacement Replace a circuit board Reactor Protection System testing Replace a main coolant pump seal Overhaul an emergency diesel generator There are several important aspects to implementing graduated work controls: • Workers must be trained on the process and must understand when to apply increased controls when the scope of the activity changes.

Download PDF sample

Good Practices for Cost-Effective Mgmt of Nuclear Powerplants (IAEA TECDOC-928)


by Richard
4.2

Rated 4.22 of 5 – based on 16 votes

Categories: Nuclear